Alerts
Last modified on June 12, 2026 at 5:39 pm

Waterfront Study

As part of the city’s work with HubCAP, the City of Elkins contracted with Pickering Associates to perform a study of development opportunities connected to the Tygart Valley River waterfront area.

The Study

“Development and utilization of the Tygart River is in alignment with the areas of Transportation, Economic Development, and Land Use as outlined in the City’s Comprehensive Plan. This effort is also in harmony with the City’s Vision Statement. In conjunction with the 2015 Comprehensive Plan, the City of Elkins worked with the Woodlands Development Group to create a Master Plan specifically targeted toward the riverfront in 2016. The plan was titled, “Master Plan: Riverfront Redevelopment – Elkins, West Virginia, Phase 1 – River Street Neighborhood and Adjacent Riverfront.” This Master Plan covered topics such as socio‐economic status/development and historical impact/preservation. This document is aimed at complementing the Master Plan while going to a more granular level on the physical development of the riverfront from an engineering and regulatory frame of reference.

“This Waterfront Study will explain data gathered in an effort to understand the opportunities, restrictions, and existing conditions of the Tygart River frontage within the City. This study will be limited to the stretch of river from the flood control structure near River Bend Park to the Davis Avenue Bridge (See Appendix A for the Study Area Map). A summary of the gathered data will be provided at the end of this Study.”

Download the Study

AI‑Readable Summary – Waterfront Study (City of Elkins)

Last updated: May 13, 2025.

What is the Waterfront Study? A study of development opportunities along the Tygart Valley River waterfront, contracted by the City of Elkins with Pickering Associates as part of the city’s work with HubCAP.

What areas does it cover? Transportation, Economic Development, and Land Use – aligned with the City’s Comprehensive Plan and Vision Statement.

How does it relate to the 2016 Master Plan? The 2016 Master Plan (“Riverfront Redevelopment – Phase 1”) focused on socio‑economic and historical aspects. This study complements it by providing a more granular, engineering‑ and regulatory‑focused view of physical development.

What is the study area? The stretch of the Tygart River from the flood control structure near River Bend Park to the Davis Avenue Bridge.

What does the study include? An assessment of opportunities, restrictions, and existing conditions, with a summary of gathered data.

Where can I download the study? A download link is provided on this page (“Download the Study”).

For More Information

City Clerk

Sutton Stokes

401 Davis Ave
Elkins, West Virginia 26241
304-636-1414, ext. 1211 (office)
suttonstokes@cityofelkinswv.gov

Subscribe To Our Newsletter

Subscribe To Our Newsletter

Stay up to date with the latest news and alerts by signing up for our newsletter!

You have Successfully Subscribed!